Allied Phase II
Des Moines, Iowa

In 2007 Northwest Steel Erection erected Phase II of the Allied campus in downtown Des Moines. This phase consisted of a steel structure 7 stories tall. The structural steel was provided by Central Minnesota. Ryan Cos was the general contractor.