Allied Phase II
Des Moines, Iowa
In 2007 Northwest Steel Erection erected Phase II of the Allied
campus in downtown Des Moines. This phase consisted of a steel
structure 7 stories tall. The structural steel was provided by
Central Minnesota. Ryan Cos was the general contractor.