Grinnell Athletic Phase II
Grinnell, Iowa
In 2009 Northwest Steel erected an addition to the Grinnell College Athletic Center. The addition consisted of a poolhouse
addition to the West and a fieldhouse addition to the North. The Poolhouse included erecting trusses 130' long. The fieldhouse
construction constisted of a 3-story building and a fieldhouse with 170' long barrell rolled trusses. Johnston Machineworks
provided the steel fabrication and Neumann Brothers was the general contractor.